Completed Projects

Completed Projects

Over the past 6 years we have worked on or completed over 100 projects across the Greater Wellington & Manawatu Regions.

The map represents the location of these projects.

10 Udy St - Petone

82 Tireti Rd - Titahi Bay

22 Stokes Valley Rd - Stokes Valley

164 Setters Line - Plamerston North

101 Blue Mountains Rd - Upper Hutt

4 William Earp Place - Tawa

14 & 16 Ngarara Rd - Waikanae

Feilding Golf Club 187 Waughs Rd - Feilding

450 Flightys Rd - Porirua

373 Colyton Rd - Feilding

41A TiroTiro Rd - Levin

37 Epiha Street - Paraparaumu

127 Waterloo Rd - Lower Hutt

17 Main Rd, Paraparaumu

34 Muri Road - Porirua

Te Roto Drive - Paraparaumu

Otaki Pool - 200 Mill Rd, Otaki

5 Paremata Cres - Porirua

77a High Street - Lower Hutt

20 Raukawa St - Lower Hutt

16 Hastings Grove - Lower Hutt

Kmart 35 Hutt Rd - Petone

12 Shaftesbury Grove - Stokes Valley

Mite 10 Wanui - Wainuiomata

47 The Esplanade - Petone

250 Paeakakariki Hill Rd - Porirua

165 Tararua Rd - Levin

572 Cemetery Road - Sanson

35-37 Annie Huggan Grove - Petone

207 Flightys Rd - Porirua

29 Udy Street - Petone

227E Whitemans Valley Rd - Whitemans Valley

66 Henderson's Line - Palmerston North

10 Criterion Street - Bulls

100-110 Te Moana Rd - Waikanae

Grow and Learn Childcare Elsdon - 20 Awarua St, Porirua

6-8 Raiha Street - Porirua

16-20 Eruini Street - Waikanae

33 Main Highway - Otaki

607 Turakina Beach Road - Koitiata

1A Mackenzie Road - Eastbourne

45 Margeret Street - Shannon

120-178 Muhunoa East Rd - Levin

29 Wylie Road - Foxton Beach

55 Jones Deviation - Porirua

1079 Paekakariki Hill Rd - Porirua

239 Wise Street - Wainuiomata

160-164 Newlands Road - Newlands

1342B Akatarawa Road - Upper Hutt

102 Liverpool Street - Levin

Tatum Park - 850 State Highway 1, Levin

1960 Coast Road - Wauniomata

85 Ludlam Crescent - Woburn

71 Kennedy Drive - Levin

315 Kelvin Grove - Palmerston North

26-40 Tremewan Street - Tawa

12 Matiu Close - Porirua

60 Tamworth Cres - Newlands

126 Jackson Street - Petone

231 Glanmire Road - Newlands

540 High Street - Lower Hutt

298B Paekakariki Hill Rd - Porirua

715 Tutaenui Road - Marton

75E Paremata Haywards Rd - Porirua

105 - 107 Victoria Sreet - Lower Hutt

133 Tory Street - Wellington City

77 Fernhill Drive - Porirua

46 Wood Leigh - Paraparaumu Beach

265 Jackson Street - Petone

Porirua School 1 Awarua St, Porirua

3865 State Highway 2 - Masterton

6 Connolly Street - Lower Hutt

248 High Street - Masterton

78 MacArthur Street - Levin

1044 Coast Rd, Wainuiomata

211 Marine Drive, Lowry Bay

758 High Street, Lower Hutt

91 Black Rock Road, Newlands

30 Benmore Cres, Manor Park

23 & 25 Fraser Cres, Upper Hutt

74 Gibbons Street, Upper Hutt

1342B Akatarawa Road, Upper Hutt

7 Rewa Terrace, Tawa

170 Bedford Street, Porirua

64 Exploration Way, Whitby

2 Starboard Lane, Whitby

67 Exploration Way

271 Grays Rd, Porirua

17 Main Rd, Paraparaumu

73 Riverbank Rd, Otaki

29 Waerenga Rd, Otaki

148 Muhunoa West Rd, Ohau

Speldhurst Country Estate, Levin

27 Norbiton Rd, Foxton

129 Parewanui Rd, Bulls

90G Paierau Road, Masterton

Ngarara Villas

Project Ngarara Villas
Location Waikanae
Client Palmer & Cook Developments

I was engaged by Palmer & Cook in early 2024 to provide traffic engineering advice to progress a 20-unit townhouse complex towards lodgement of resource consent

My involvement included providing advice to the project team on parking and access design as well as servicing for rubbish trucks. This is included carrying out vehicle tracking and swept path checks as the project was progressed. A transport assessment was completed. The resource consent for the development was granted in September 2024.

Papakōwhai Road Shared Path

Project Papakōwhai Road Shared Path
Location Porirua
Client Porirua City Council

I was engaged throughout 2023 and 2024 to carry out three safe system audits of a project that included the design and construction of a shared path along Papakōwhai Road with Porirua City. The project was aimed at providing safe connections for people walking and cycling between the residential areas, nearby Lagoon as well as the Police College.

Safe system audits were completed at the concept, detailed design and post construction stages of the project with the design team and client making improvements throughout the design to improve its future safety performance

Construction of the project was completed in late 2024.

Shaftesbury Grove Private Plan Change

Project Shaftesbury Grove Private Plan Change
Location Stokes Valley
Client Hutt City Council

I was engaged during 2024 to carry out the peer review of a transport assessment prepared for a private plan change of a property located in Stokes Valley. The applicant was seeking to rezone a site adjacent to an existing residential area to the same residential zoning. My review required particular consideration of the receiving transport environment including roads, intersections, road safety performance, and sustainable transport considerations.

As part of the process, further information was sought regarding potential intersection capacity constraints and overall trip distribution. The plan change progressed to a plan change hearing in late 2024 with this requiring the preparation traffic engineering evidence.

The plan change was granted by an independent commissioner in late 2024.
The resource consent for the development was granted in late 2024.

Lifestyle Subdivision Colyton

Project 373 Colyton Road
Location Colyton, Manawatu
Client Geoworks Ltd

I was engaged by Geoworks (on behalf of their client) in early 2024 to carry out a traffic impact assessment on a large 70 lot lifestyle subdivision. Earlier a resource consent application had been lodged with council in which several matters concerning transport were raised in a request for further information. Particular considerations included the proposed subdivision layout including the standard of proposed roads and connectivity to the existing road network.

The resource consent for the development was granted in late 2024.

Ōtaki Pool Redevelopment

Project Ōtaki Pool Redevelopment
Location Ōtaki
Client Kāpiti Coast District Council

I was engaged by the Kāpiti Coast District Council in May 2024 to carry out a review of the existing parking areas surrounding the Ōtaki Pool complex. At this time council were planning significant upgrade works to the pool complex and wanted to understand how the carpark was functioning including the levels of occupancy throughout different times of the day. Several days of parking surveys were carried out across different time periods with this designed to understand how different activities effected parking supply throughout the day.

The findings of the survey were presented in a report to councils project team, with the client deciding to look at options to increase parking supply in the future.

Poriura Mixed Use Development

Project 5 Paremata Crescent, Porirua – Mixed Use Development
Location Porirua City
Client Porirua City Council

I was engaged by Porirua City Council during 2023 to carry out a peer review of an integrated transport assessment prepared by the applicant for a 5-storey mixed use development comprising of 16 apartments and 2 commercial tenancies.
The project ended up going to a hearing (due to non traffic matters). This therefore included preparing expert evidence and attending the hearing.

The resource consent was granted in May 2024.

Pukerua Bay 152 Lot Subdivision

Project 34 Muri Road, Pukerua Bay – 152 Lot Subdivision
Location Porirua City
Client Porirua City Council

I was engaged on behalf of council to peer review the applicant’s integrated transport assessment. This review focused heavily on potential adverse traffic effects on the existing transport network of which there were many. The project involved significant upgrades to Muri Road, including road widening, street lighting and new footpaths. My involvement also included drafting of transport specific consent conditions.

The resource consent was granted in January 2024.

Levin Family Health

Project Levin Family Health (Medical Centre – Speldhurst Country Estate)
Location Levin
Client Wayne Bishop Group Ltd (WBG)

I was engaged by WBG to carry out a traffic impact assessment on a proposal to establish a new medical centre within the Speldhurst Lifestyle Village. My assessment assessed the transport effects of the proposal, noting that up to 4000 patients were expected to be enrolled over time. Consideration was given to vehicle access, parking, servicing and impacts on the adjacent State Highway.

Council granted resource consent in late 2022.

Regional Minor Civil Works

Project Regional Minor Civil Works
Location Wellington Region (several locations)
Client Greater Wellington Regional Council

I was engaged by Greater Wellington Regional Council as part of a multi year professional services contract during 2022 and 2023 to project manage the planning, design and delivery of a package of minor public transport projects throughout Wellington City, Lower Hutt & Masterton.

The projects were largely aimed at resolving accessibility issues at bus stops as well forming and constructing a bus turnaround area and improving access for buses to existing train station park & rides. Construction was completed on all sites in November 2023.

Ropata Retirement Village

Project Ropata Retirement Village (Traffic Engineering Services)
Location Lower Hutt City
Client Urban Edge Planning Ltd

I was engaged by Urban Edge Planning in mid 2021 on behalf of Ropata Lodge Ltd to carry out an integrated transport assessment of a proposed 48 unit retirement village on High Street. The location of the proposed village within a residential area required a detailed assessment to be undertaken including carrying out on street parking surveys and inputting into the design of the vehicle circulation and parking areas within the site.

The proposed retirement village went through a notification process resulting in several submissions being received in opposition to the proposed village resulting in an independent hearings commissioner being appointed to run a hearing on the application. I was required to prepare detailed evidence in advance of the hearing, addressing the many concerns raised in the submissions.

In October 2023, the resource consent was granted for the 48 unit retirement village – a successful outcome for the client.

Pukerua Bay To Porirua Walking & Cycling Improvements

Project Pukerua Bay To Porirua Walking & Cycling Improvements (stage 1 & 2)
Location Pukerua Bay to Porirua CBD
Client Porirua City Council

I was engaged by Porirua City Council in early 2021 to project manage the design and delivery of a package of walking and cycling improvements between the Porirua CBD and Pukerua Bay including a package of cycle wayfinding and a shared path upgrade.

Upon council confirming additional funding in late 2021 I was engaged again to deliver stage 2 of the project which included managing the detailed design of two intersection upgrades and overseeing construction.